Tales from a Kitchen Designer (Photos)

View photos of my kitchen remodel currently in progress. The most recent photos are at the top of the page.


DSCN0885

Tales from a Kitchen Designer (Part 2)

Well, Valentines Day came early to our house. Last week our contractor called and asked if he could start our project sooner than we had planned. Originally he was to start on Monday, Feb 14th. That would allow us a week to clean and pack after the baby shower my wife was hosting. After talking to her, we decided why prolong the inevitable, so we decided that Monday Feb 7th would be D-Day. as soon as the party was over Saturday night, we frantically started packing up our kitchen. While plates, dishes and breakables were carefully wrapped and boxed, the kid’s plastic plates and Tupperware went flying.